Published: 2022-12-13

Fire-Resistant Cables- Heat Release Measurements

R. Arunjothi, Thirumurthy ., K. P. Meena

1-7

DOI: https://doi.org/10.33686/pr.v18i1.1082

An Approach to Determine Health Index of Power Cable System

Dillip Kumar Puhan, Rajat Sharma, K. P. Meena

9-12

DOI: https://doi.org/10.33686/pr.v18i1.1083

Pre Qualification Test on 220 KV Cable System – CPRI Experience

K. P. Meena, Thirumurthy ., G. K. Raja, R. Arunjothi, P. V. Satheeshkumar

13-17

DOI: https://doi.org/10.33686/pr.v18i1.1084
DOI: https://doi.org/10.33686/pr.v18i1.1085

Nodal Monitoring in Medium Voltage Distribution Grid using Smart Sensored Cable Termination

Sanjeev Atri, Ravindra Bhanage, H. C. Sharma, Aashish Agrawal

25-31

DOI: https://doi.org/10.33686/pr.v18i1.1093

Short Circuit Testing of Cables: HPL Experience

V. Sreeram, M. Rajkumar, S. Sudhakara Reddy, T. Gurudev, Maroti .

33-36

DOI: https://doi.org/10.33686/pr.v18i1.1094
DOI: https://doi.org/10.33686/pr.v18i1.1095

Effect of Moisture Content on the Performance of PPLP as a Dielectric for HTS Power Cable

Maalika Sarkar, Isaac De Souza, Abhik Sarkar, Abhay Singh Gour, Vutukuru Vasudeva Rao

45-51

DOI: https://doi.org/10.33686/pr.v18i1.1096

Development of Supervisory Control and Data Acquisition System for India’s First High Temperature Superconducting Cable Testing

Isaac de Souza, Abhik Sarkar, Maalika Sarkar, Abhay Singh Gour, Vutukuru Vasudeva Rao

53-59

DOI: https://doi.org/10.33686/pr.v18i1.1097
DOI: https://doi.org/10.33686/pr.v18i1.1098
DOI: https://doi.org/10.33686/pr.v18i1.1099
DOI: https://doi.org/10.33686/pr.v18i1.1100

Understanding of XLPE Cable System Commissioning using Partial Discharge Measurements during AC HV Tests

Vasudev Patil, Arun Yargole, Fazle Masood, Imteyaz Siddiqui, Simon Sutton

85-91

DOI: https://doi.org/10.33686/pr.v18i1.1101