Assessment of Stator Winding Insulation. Part 2 – Tests on Inservice Machines

##plugins.themes.academic_pro.article.main##

B. Nageshwar Rao
K. Mallikarjunappa
C. D. Keri
T. R. Afzal Ahamed
A. Sudhindra
B. Ramachandra

Abstract

This paper presents the test results and analysis made on several machines at site. Case studies are employed to illustrate the usefulness of measurements on the stator windings in service.

##plugins.themes.academic_pro.article.details##

How to Cite
Nageshwar Rao, B., Mallikarjunappa, K., Keri, C. D., Afzal Ahamed, T. R., Sudhindra, A., & Ramachandra, B. (2010). Assessment of Stator Winding Insulation. Part 2 – Tests on Inservice Machines. Power Research - A Journal of CPRI, 77–85. Retrieved from https://node6473.myfcloud.com/~geosocin/CPRI/index.php/pr/article/view/687

References

  1. Simons J S. "Diagnostic testing of high voltage machine insulation", IEE Proceedings, Vol. 127, part B, No. 3, 1980.
  2. Kelen A. "Diagnostics of HV machine insulation from inspection to continuous monitoring", CIGRE Symposium 05-97, Section 10-2, 1987.
  3. Stark K H. " Assessment of the insulation serviceability of Turbo generator stators and of HV bushings", Proceedings A, pp. 71-88, 1962. Readers.

Similar Articles

1 2 3 > >> 

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)

1 2 > >>