Operational Optimization of Turbo Generator Units and Auxiliaries in Large Run - off the River Hydro Power Plants
##plugins.themes.academic_pro.article.main##
Abstract
##plugins.themes.academic_pro.article.details##
References
- Howard, C D D. “Hydroelectric system operations optimisation”, Great Wall World Renewable Energy Forum and Exhibition, 24–27th October 2006.
- Mario T L, Barros, et al. “Optimization of large-scale hydropower system operations”, Journal of water resources planning and management © ASCE/May/June 2003, pp. 178–188.
- Aldo Cateni, et al. “Optimization of hydro power plants performance importance of rehabilitation and maintenance in particular for the runner profi les”, 7th International Conference on Hydraulic Effi ciency Measurements, September 3rd-6th 2008, Milan, Italy.
- Reports of Energy audit, conducted in various hydro-power plants by CPRI, Bangalore.