Enhancement of Energy Effi ciency of Hydro Turbine Generators by Energy Conservation Techniques

##plugins.themes.academic_pro.article.main##

Rajashekar P. Mandi
Udaykumar R. Yaragatti

Abstract

This paper describes the results of enhancing energy effi ciency of hydro turbines by implementing the energy conservation measures for hydro turbine generators. The procedure for evaluating the on-line performance of generators is discussed. The energy saving in generators by maintaining optimum generator terminal voltage, by reducing the stator winding temperature, by improving the performance of coolers and reducing the excitation loss by appropriate tuning of excitation system are enumerated in detail with case studies. The implementation of energy conservation measures has a techno-economic feasibility with a payback period of 1–5 years.

##plugins.themes.academic_pro.article.details##

How to Cite
Mandi, R. P., & Yaragatti, U. R. (2012). Enhancement of Energy Effi ciency of Hydro Turbine Generators by Energy Conservation Techniques. Power Research - A Journal of CPRI, 77–86. Retrieved from https://node6473.myfcloud.com/~geosocin/CPRI/index.php/pr/article/view/664

References

  1. CEA, 2011, website: http//:www.cea.nic.in.
  2. IEEE Std 492-1999, IEEE, Guide for Operation and Maintenance of Hydro-Generators.
  3. Ye L, et al. “An integral criterion appraising the overall quality of a computer-based hydro turbine generating system”, IEEE, Trans Energy Conversion, Vol. 10, No. 2, pp. 376–381, 1995.
  4. Ye L, et al. “Intelligent control-maintenancemanagement system and its applications on hydropower system”, Management and Control of Production and Logistics 2000, IFAC/IFIP/IEEE, Pergamon, Vol. 2, pp. 609–614, 2000.
  5. Yongqian Liu, et al. “Economic performance evaluation method for hydroelectric generating units”, Energy Conversion and Management, Pergamon, Vol. 44, pp. 797–808, 2003.
  6. Geoff Klempner and Isidor Kerszenbaum. “Operation and maintenance of large turbo-generators”, IEEE, Press, Wiley-Interscience. 2004.
  7. IEEE 432–1992, IEEE, Guide for Insulation Maintenance for Rotating Electrical Machinery (5hp to less than 10000hp).
  8. Isidor Kerszenbaum. “Inspection of large synchronous machines. checklists, failure identifi cation, and troubleshooting”, IEEE, Power Engineering Series, 1996.

Most read articles by the same author(s)

<< < 1 2